Public Notice of Intent for Big Vein Portals
The proposed action consists of:
a) Closure of open mine portal
b) Repair and stabilization of subsidence area.
c) Establishing drainage control over the affected area
d) Regrade the disturbed areas
e) Revegetation of all disturbed areas.