Roadway Reconfiguration Project

The Town of Blacksburg is in the planning stages of a project to improve bicyclist and pedestrian safety and infrastructure on North Main Street from Prices Fork Road to Red Maple Drive. The Town is working with VHB, an engineering and planning firm, to evaluate reconfiguring from four vehicular lanes to three lanes in the project area to address safety challenges, speeding concerns, and limited infrastructure for pedestrians and cyclists.
The Town is proposing a mix of improvements in the existing right-of-way, primarily paint and signage changes. These changes include separated bicycle lanes, a center left-turn lane, additional crosswalks, intersection improvements, and a reduced speed limit. The Town plans to incorporate these changes into the repaving of North Main Street in the near future.
Ways to get involved and share your thoughts:
In-Person Engagement: You are invited to a project open house in the Multipurpose Room at the Blacksburg Community Center on Wednesday, December 2, from 5:00 to 7:00 PM to review proposed changes and share your feedback with project staff.
Online Survey: A public input survey will be available on Let’s Talk Blacksburg beginning on December 3. The survey will close on December 31 at 5pm.
To learn more about the project, please visit: https://letstalkblacksburg.org/roadway-reconfiguration. Project drawings will be available on the website following the public meeting on December 2.
There will be a second phase of public engagement in 2027 for longer-term improvements along the North Main Corridor, such as wider sidewalks, landscaping, and integrated transit stops.
Questions: Contact Kali Casper (kcasper@blacksburg.gov), 540-443-1300.






